EV Power Distribution Panel Request | Custom Engineered

Let our custom-designed and proven Level 3 and Level 2 products power your project

(See testimonial below)

Your project needs electric vehicle charging stations, but you're concerned about costs, materials availability, lead times, and labor. Our all-in-one, plug-and-play electrical distribution product (SnapEV™) is your solution: simply 1) attach to grid, 2) attach to chargers, and 3) charge vehicles. That's it.

 

Whether you need a custom unit or one of our stock options, we're delivering within 4 to 6 weeks on average thanks to our in-house engineering and production staff.

 

Every unit is built by American skilled labor in Massachusetts, and is fully load tested prior to leaving our facility to ensure it's ready to go live. We have hundreds of units installed in the field and performing for years, part of why we are trusted by utilities all over the country: we build the best EV charging distribution you'll come across.

 

Experience the difference that experience can make - find out how Merrimac Industrial Sales can make your project shine by filling out the form lower down on this page. And thanks for trusting us - it won't be misplaced.



Contact us for a complimentary consultation with an engineer:

  • Calculator
  • Standard Flow Rate (SCFM) Calculator

    Calculate the SCFM.

    Power Flowrate Calculator

    Calculate the electrical power, flow rate or temperature requirement.

    Temperature Conversion

    Fill in one value to calculate the other.

    Ohms Law Calculator

    Fill in two values to find the other two.

    Pressure Conversion

    Fill in one value to calculate the other.

    Three Phase Unit Calculator

    Fill in two values to find the 3rd.

    Single Phase Unit Calculator

    Fill in two values to find the 3rd.

    Copyright © 2026 Merrimac Industrial Sales. All Rights Reserved.